Exterior and Hull
In our last installment, we prepped the bottom of our behemoth Spectra 20 for extensive modifications to its lifting strakes. As we were on the cusp of getting into the lamination of the actual structures that would be shaped into the lifting strakes, a patch of bad weather stopped us dead in our tracks. Luckily, the motivation to get the bottom of the boat done, which had waned early in the project, wasn’t going to be thwarted with a couple of rainy days. Once the clouds cleared, we got back to work preparing for the modifications to the bottom of our hull.